CDM Documents
CDM (GB) Knowledge Base
The following list of documents is required for CDM projects but please note that the notification is only required for notifiable projects.
The list is not exhaustive. It provides a link to topics in the knowledge base for those starting from this point;
- Project Notification - Form 10
Specific information that must be notified to the HSE if the project is notifiable. - Pre-Construction Information
Pre-construction Information is required to be supplied by the client on all projects. - Construction Phase Plan
The Construction Phase Plan is required for all projects under CDM 2015 to provide for effective health and safety management during the construction. - Health and Safety File
The Health and Safety File is to be produced on all projects, and is prepared by the Principal Designer. If a Health and Safety File exists for a structure that is to be modified by the project construction, the existing Health and Safety File will need to be amended to reflect the changes. The client will need to establish who will update any existing Health and Safety Files.