﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>CDM: Content of Pre-Construction Health &amp; Safety Plan</title>
    <description>Content of Pre-Construction Health &amp; Safety Plan posted by Ai Solutions in the CDM forum on the Safety Matters health and safety community website</description>
    <link>https://www.aisolutions.co.uk/community/Forums/CDM/Content-of-Pre-Construction-Health-Safety-Plan</link>
    <language>en-gb</language>
    <copyright>Copyright 2026, Ai Solutions Ltd</copyright>
    <lastBuildDate>Wed, 15 Dec 2004 08:03:10 GMT</lastBuildDate>
    <generator>Ai Solutions Rss Generator</generator>
    <item>
      <title>Posted by Ai Solutions on 15 December, 2004</title>
      <description>&lt;div class="alert alert-info"&gt;&lt;p&gt;&lt;em&gt;The question above was originally posed via our Ask A Guru feature and this response from 2004 was by either Dave Carr or Michael Stokes.&lt;/em&gt;&lt;/p&gt;&lt;/div&gt;
&lt;p&gt;You are correct.&lt;br&gt;
&lt;br&gt;
The pre-construction h&amp;amp;s plan only needs to contain information about the project and any significant hazards that the designers have been unable to avoid.&lt;br&gt;
&lt;br&gt;
It does not require to identify insignificant hazards that a competent contractor should be aware of. The issues that she raises are clearly site related ones that are the responsibility of the principal contractor.&lt;/p&gt;</description>
      <link>https://www.aisolutions.co.uk/community/Forums/CDM/Content-of-Pre-Construction-Health-Safety-Plan#entry45</link>
      <author>nospam@nospam.com (Ai Solutions)</author>
      <guid>/community/Forums/CDM/Content-of-Pre-Construction-Health-Safety-Plan#entry45</guid>
      <pubDate>Wed, 15 Dec 2004 08:03:10 GMT</pubDate>
    </item>
    <item>
      <title>Posted by Ai Solutions on 15 December, 2004</title>
      <description>&lt;p&gt;Please could you confirm (or maybe not) that statements such as &amp;#034;&lt;em&gt;the relevant PPE must be worn on site&lt;/em&gt;&amp;#034; and &amp;#034;&lt;em&gt;all gas installations to be carried out by CORGI registered personnel&lt;/em&gt;&amp;#034; do not really need to be included in the Pre Construction Plan, as a competent Contractor will already be aware of the legislation which covers such matters.&lt;/p&gt;</description>
      <link>https://www.aisolutions.co.uk/community/Forums/CDM/Content-of-Pre-Construction-Health-Safety-Plan#entry44</link>
      <author>nospam@nospam.com (Ai Solutions)</author>
      <guid>/community/Forums/CDM/Content-of-Pre-Construction-Health-Safety-Plan#entry44</guid>
      <pubDate>Wed, 15 Dec 2004 08:03:00 GMT</pubDate>
    </item>
  </channel>
</rss>